One of the biggest advantages of EPS Cement Sandwich Wall Panel is its simple, fast installation process that does not require highly specialized skilled workers. For construction contractors, mastering the correct installation method can help them cut project timelines by more than half, reduce labor costs significantly, and deliver higher quality finished walls for their clients. The first step of the installation process is to clean and level the floor and the top structural beam where the wall will be installed, then mark the exact position of the wall line on both the floor and the ceiling. After that, place the special bottom guide track on the marked floor line, fix it with expansion bolts, and place the top guide track on the corresponding ceiling position.
Next, lift the first EPS Cement Sandwich Wall Panel, slot it into the bottom and top guide tracks, and adjust it to make sure it is perfectly vertical. Connect adjacent panels together using the special matching connectors, and apply a thin layer of specialized sealant in the joint between two panels to ensure the joint is fully sealed for insulation and sound insulation performance. After all panels are installed and fixed securely to the main building structure, you can run electrical wiring and water pipes directly in the pre-reserved grooves on the panel surface, no need to chisel deep trenches into the wall like you do with traditional brick walls. Once the wiring work is finished, you can apply a thin layer of putty on the panel surface, and then proceed directly to painting, tiling or other interior finishing work.
The entire installation process produces almost no construction waste, and there is no messy wet plastering work that requires days of drying time. A team of 3-4 workers can install 30-40 square meters of EPS Cement Sandwich Wall Panel in a single work day, which is 5-6 times the efficiency of traditional bricklaying. Contractors who switch to this wall material report that they can take on far more projects every year, and their clients are far more satisfied with the faster construction speed and cleaner construction site. Following the correct installation steps ensures that the wall panel delivers 100% of its designed performance, maintaining its excellent insulation, fireproof and sound insulation properties for more than 50 years.